From the first phone call to handover — exactly what happens, who does what, and how long each stage takes, so there are no surprises in your home or on your site.

Home/Process

A stretch ceiling is a manufactured product installed on site, not a finish built on site. That one difference is why the work is clean and fast — and why the preparation stages matter more than the installation day.

01

Free Consultation & Site Visit

We discuss how the room is used, your lighting plan and the look you want. Our team visits your site in Raipur or nearby, checks slab height, beam positions, AC ducting and electrical routing, and tells you honestly what the space can support.

02

Design & Finish Selection

You choose the membrane type, finish and shade, and we show visualisations so you can see the result before committing. Print files are proofed at actual size for printed and sky ceilings.

03

Laser Measurement & Planning

Every edge is laser-measured and the panel is cut to your exact room geometry. We finalise profile type, seam placement, LED spacing and cut-outs for lights, fans, diffusers and sprinklers at this stage.

04

Off-Site Fabrication

Your membrane is welded and finished in a controlled environment to the measured dimensions. This is what keeps on-site work clean and fast.

05

Professional Installation

Our certified team fixes the perimeter profile, warms and tensions the membrane, and integrates the lighting. Most rooms are complete in one day with virtually no dust.

06

Quality Check & Handover

We inspect tension, edges, light uniformity and all cut-outs with you, then hand over care instructions and warranty papers.

Timeline

What to Expect, Week by Week

Week 1 — Survey, design and measurement

Site visit, slab height and obstruction check, finish and colour selection, lighting discussion, then laser measurement once the room is at a stage where dimensions are final. For printed ceilings, artwork is proofed at actual size during this period.

Week 2 — Fabrication

Your panel is welded, printed if required, and finished to the measured dimensions in a controlled environment. Profiles, LED modules, drivers and trims are collated for the installation date.

Week 3 — Installation and handover

Perimeter profile fixed and levelled, cavity and lighting installed where applicable, membrane warmed and tensioned, cut-outs finished, then a joint inspection of tension, edges, light uniformity and all openings. You receive care instructions and warranty papers.

What we need from you

  • Final decisions on finish, shade and lighting before measurement.
  • Civil, plaster and flooring work in the room substantially complete.
  • Electrical points and switching plan confirmed.
  • Clear access around the room perimeter on installation day.
  • For heavy fittings, confirmation of the fixture and weight so slab anchors can be planned.
FAQ

Installation Process — FAQs

How long does the whole project take from enquiry to finished ceiling?

Typically two to three weeks. Site survey within a day or two of your enquiry, finish selection and measurement next, fabrication in 5 to 10 days depending on membrane and print, then installation in about a day per room.

Do I need to empty the room before installation?

Usually not. We ask for clear access around the perimeter and that fragile items be moved, but most furniture can stay. There is no plastering or sanding, so there is very little dust to protect against.

Who handles the electrical work?

We integrate the lighting into the ceiling and can coordinate closely with your electrician, or handle the ceiling-side wiring ourselves depending on the scope agreed. Either way, LED positions, driver locations and switching are decided before fabrication.

Is a heat gun used during installation? Is that safe indoors?

Yes, PVC membranes are warmed with a gas or electric heat source so they become elastic enough to tension, then they cool and tighten to a perfectly flat surface. It is a standard, controlled part of the process carried out by trained installers with the room ventilated.

What if measurements change after fabrication?

That is exactly why we measure the finished room rather than the drawing, after plaster, flooring level and any wall cladding are settled. If a dimension genuinely changes, panels can often be adjusted, but it is far cheaper to measure at the right moment.